Completed Projects
Aux Delices, Stamford CT
Our customer needed to consolidate food production for 4 retail locations and a catering operation. One central production facility was created with 6 walk-in cooler/freezers as part of their food storage area, a production kitchen, and a bakery.
Central High School, Bridgeport CT
The food service director needed to update an aging facility with a new look. The existing equipment no longer produced or displayed the current menu items.
Great River Country Club, Milford CT
A private developer came to Globe to design the kitchen for a new golf club under construction. A full kitchen, snack bar, and supplies were provided in time for their opening.
Quinnipiac Club, New Haven CT
There are times when a simple delivery is not simple. A new refrigerator required a crane to place it on a 2nd floor patio roof. From there, it was an easy delivery.
Lenny's Indian Head, Branford CT
There are times when a customer needs help in deciding what equipment will perform best. This customer serves a heavily battered fish product which had prevented fry filter systems from performing properly. Globe and Pitco arranged for a demonstration of a new fryer by their reps. It arrived on a trailer with electrical and propane utilities. The customer was able to successfully test the unit prior to his purchase.
Smith House, Stamford CT
This nursing facility required a new kitchen as part of their expansion. Refrigeration, electric cooking equipment, warewashing, water-wash hood system, and a conveyor tray make-up system were included in the installation.
MBI Corporation, Shelton CT
When moving to an additional facility, this industrial account needed an employee cafeteria. A prep kitchen and serving line were designed and installed.